EV charging cost: what a home charge costs today

Enter battery size, charge level and charging power. The calculator finds the cheapest continuous charging window in the published prices.

Wallbox usually 11 kW, socket 2.3 kW

Charging losses, country, tariff

Assumption, varies by car and power

2025 average per the Federal Network Agency; yours is on your bill

From your contract (excluding standing charge)

Cheapest time to start charging

tomorrow at 02:30

€8.24 for 40.0 kWh from the grid

Energy into the battery36.0 kWh
Charging time3.75 h
Finished attomorrow at 06:15
Average all-in price20.6 ct/kWh

Calculation method and sources

Exchange price + 0.00 ct markup + 10.72 ct grid fee + electricity tax 2.05 ct + levies 2.946 ct + concession fee, plus 19% VAT. Standing charge and meter fee not included.

Latest day with prices: 25 October 2026. Day-ahead wholesale prices: Bundesnetzagentur | SMARD.de (CC BY 4.0), fetched on 24 October 2026. Calculation: Radif Partners

Charging an electric car at home on a dynamic tariff costs the kilowatt-hours drawn from the grid times the all-in price of the quarter hours in which you charge. As an example, a battery with 60 kWh usable capacity charged from 20 to 80% takes in 36 kWh; with an assumed 10% charging loss, 40.0 kWh come from the grid. On an 11 kW wallbox that takes about 3.8 hours, on a 2.3 kW household socket about 17.5 hours. On 25 October 2026, a wallbox charge in Germany costs €8.24 in the cheapest window starting at 02:30 and €10.99 in the dearest starting at 17:00, with the average grid fee, electricity tax, levies, concession fee and VAT but no supplier markup. In the Netherlands, with energy tax and VAT, the same charge costs €4.26 at best and €9.74 at worst. On a socket the charge stretches over so many hours that cheap and dear times mix. The faster you charge, the more precisely the charge hits the cheapest quarter hours.

Checked by Radif Partners · Editorial policy · Method and sources

One charge on 25 October 2026

60 kWh battery, 20 to 80%, 40.0 kWh from the grid (10% loss assumed), all-in before markup
Charge pointDurationDE best startDE costNL best startNL cost
Wallbox 11 kW3.75 h02:30€8.2410:15€4.26
Socket 2.3 kW17.50 h00:00€8.2800:00€4.39

Quarter-hourly prices come from Bundesnetzagentur | SMARD.de: wholesale electricity prices (CC BY 4.0). A window that runs past midnight can only be found once the next day is published; before that, the search stays within the rest of today.

What the cost includes

The German all-in price includes the average grid fee, electricity tax, levies, concession fee and VAT; the Dutch one includes energy tax from the Environmental Taxes Act (Wbm), articles 59 and 63 (1 January 2026) and VAT. Your supplier’s markup is added once you enter it under “Charging losses, country, tariff”. In Germany every supplier must offer a dynamic tariff to customers with a smart metering system (Energy Industry Act (EnWG), section 41a: dynamic tariffs).

Over a month

If you charge every night or every midday, dynamic electricity tariff with the night profile shows what that adds up to over 30 days against a fixed price. The particularly cheap quarter hours with exchange prices below zero are on negative electricity prices.

Frequently asked questions

How large are EV charging losses?

Some energy is lost as heat in the car’s on-board charger, the cables and the battery. How much depends on the car, the charging power and the temperature; at very low power from a household socket the share is usually higher than on a wallbox. The calculator assumes 10%, and you can adjust that under “Charging losses” to match your car.

Can charging start automatically in the cheap hours?

Many wallboxes and cars can be set to start at a given time or to finish by a departure time, and some read dynamic prices themselves. Without such a feature, set the start by hand to the window the calculator shows. From early afternoon the prices for the coming night are known as well, so an overnight charge can be planned the same day.

Is a wallbox worth it compared with a socket?

For catching the cheap hours, yes: at 11 kW a charge from 20 to 80% fits into a few hours and so into the cheapest window, while at 2.3 kW it takes nearly a whole day. Safety and lower losses come on top. Whether the purchase pays off depends on your mileage and installation costs, which we cannot know here.

Related pages and calculators

Sources

Written by

Publisher of calculators for the quarter-hourly day-ahead power price in Germany, the Netherlands, Belgium, Austria and Poland

Updated on · Editorial policy · Contact

Prices 2026, loaded on